Pologne

Impact de la déplétion sur la géopolitique présente, passée et à venir.

Modérateurs : Rod, Modérateurs

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 105520
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pologne

Message par energy_isere »

suite de ce post du 28 fev 2026 : http://www.oleocene.org/phpBB3/viewtopi ... 3#p2422043

L'industrie Polonaise se prépare pour le projet de premier SMR dans le pays.
Polish companies team up for regional SMR deployment

Thursday, 2 April 2026

Poland's Synthos Green Energy, construction engineering firm Polimex Mostostal and engineering consultant ATEC Group have signed a memorandum of understanding to cooperate on the development and deployment of BWRX-300 small modular reactors in Central and Eastern Europe.
......................
https://www.world-nuclear-news.org/arti ... deployment
Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 105520
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pologne

Message par energy_isere »

suite de ce post du 13 janvier 2026 : http://www.oleocene.org/phpBB3/viewtopi ... 6#p2420756
Application lodged for Poland's first nuclear power plant

Tuesday, 31 March 2026

Polskie Elektrownie Jądrowe has submitted an application to Poland's National Atomic Energy Agency for a construction permit for the country's first nuclear power plant.

One of the key elements of the documentation submitted with the licence application is the Preliminary Safety Analysis Report (PSAR). This report is one of the most important attachments, detailing the power plant design and its location. It also includes comprehensive analyses of technical and environmental factors demonstrating that the proposed solutions meet all requirements for nuclear safety, physical protection, radiological protection, and nuclear material safeguards for this type of facility.
.......................................
https://www.world-nuclear-news.org/arti ... ower-plant
Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 105520
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pologne

Message par energy_isere »

Le site envisagé pour la première centrale nucléaire en Pologne est adapté.
Site of Polish plant deemed suitable

Friday, 8 May 2026

The Lubiatowo-Kopalino site is a suitable location for Poland's first nuclear power plant, the president of the National Atomic Energy Agency has determined after examining the Preliminary Site Report for the facility.
....................
lire https://www.world-nuclear-news.org/arti ... d-suitable

https://fr.wikipedia.org/wiki/Centrale_ ... opilot.com

c'est ici :

Image
Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 105520
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pologne

Message par energy_isere »

Projet de FSRU pour un terminal LNG dans le golfe de Gdansk en Pologne. capacité de 6.1 milliards de m3 par an. Mise en service prévue en 2028.
KN Energies Selected as Commercial and Operational Advisor for the FSRU Project in the Gulf of Gdańsk

édité le 01/06/2026

International terminal operator KN Energies has been awarded a contract by GAZ-SYSTEM S.A. to provide commercial and operational advisory services for the FSRU project in the Gulf of Gdańsk in Poland.

The first stage of the terminal, based on a floating storage and regasification unit (FSRU), will receive LNG delivered by sea, regasify it and supply natural gas to Poland’s transmission system. It is expected to provide up to 6.1 billion cubic metres of natural gas per year and is planned to be commissioned in 2028. In March 2026 GAZ-SYSTEM launched the FSRU 2 Open Season aimed at increasing the regasification capacity of the FSRU terminal in the Gulf of Gdańsk.

KN Energies’ role will include commercial and operational advisory services for the FSRU project, drawing on the company’s strong expertise in floating LNG infrastructure, gained through the long-term operation of the Klaipėda LNG terminal and participation in multiple FSRU and floating terminal projects across Europe.

The Gulf of Gdańsk FSRU development is strategically important for Poland and the wider Baltic Sea region, aimed at strengthening gas supply diversification and long-term energy security.

“This selection highlights the growing need for fast-track energy supply diversification solutions and confirms KN Energies’ expertise as a leader in complex floating LNG projects across Europe. With more than 15 years of experience in FSRU projects globally – from the development phase to long-term terminal operations – we are proud to share our know-how with our partners in Poland,” said Linas Kilda, Chief Business Development Officer at KN Energies.

Beyond the Klaipėda LNG terminal, there are currently 14 floating LNG terminals in operation or under construction across the European Union. KN Energies has been or is involved in projects related to 8 of these terminals, representing approximately 57% of all such projects in the EU, covering project development, commercial structuring, operational advisory and long-term terminal operations. This positions the company among the most experienced FSRU players in the European market.
.................................
https://www.euro-petrole.com/kn-energie ... -n-i-30148
Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 105520
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pologne

Message par energy_isere »

EDF power solutions met en service la batterie la plus puissante de Pologne
Situé dans la ville de Stary Grodków, dans le sud du pays, le projet d’une capacité de 50 MW (120 MWh) fait l’objet d’un contrat de capacité de 17 ans avec l’opérateur du réseau électrique polonais, pour notamment faciliter l’intégration des actifs de production d’énergie renouvelable.

Par Gwénaëlle Deboutte 26 Mai 2026

Image
La batterie Stary Grodkow en Pologne. | Image : EDF power solutions

Le Français EDF power solutions a mis en service sa première batterie en Pologne. Il s’agit de l’installation la plus puissante du pays avec une capacité de 50 MW (120 MWh). Situé dans la ville de Stary Grodków, dans le sud du pays, le projet fait l’objet d’un contrat de capacité de 17 ans avec l’opérateur du réseau électrique polonais. Le système de stockage d’énergie par batterie (BESS) de Stary Grodków se compose de 24 conteneurs de modules associés à des infrastructures électriques dont un poste de transformation et un raccordement au réseau 110 kV.

La mise en service de Stary Grodków s’inscrit dans la stratégie d’EDF power solutions de développement des batteries en Pologne avec plusieurs projets sécurisés pour une capacité totale de 370 MW. Ces capacités de stockage apporteront de la flexibilité au réseau électrique et faciliteront l’intégration des actifs de production d’énergie renouvelable dans le cadre de la décarbonation du mix électrique polonais. « Les investissements comme celui de Stary Grodków renforcent la stabilité du réseau. Le groupe PGE (Polska Grupa Energetyczna) prévoit de développer plus de 80 installations de stockage d’énergie par batteries d’une capacité totale dépassant 10 000 MWh, qui seront situées à côté des postes électriques existants dans toute la Pologne », a déclaré Miłosz Motyka, ministre de l’Énergie.

Présente en Pologne depuis 14 ans, EDF power solutions y exploite actuellement cinq parcs éoliens terrestres et développe des centrales électriques bas carbone pour accompagner la transition énergétique tout en renforçant le système électrique grâce à des solutions de stockage
https://www.pv-magazine.fr/2026/05/26/e ... e-pologne/
Répondre