https://www.mining.com/trapper-target-e ... -labrador/Trapper target emerges as Saga’s top titanium-vanadium plot in Labrador
Blair McBride | January 5, 2026
Initial drilling by Saga Metals (TSXV: SAGA) at its Radar iron-titanium-vanadium project in Labrador is revealing high grades at shallow depths that show its Trapper target rivals the nearby Hawkeye zone. Shares jumped.
Highlight hole R-0009 cut 296 metres grading 39.75% iron oxide, 7.46% titanium oxide (TiO₂) and 0.25% vanadium oxide (V₂O₅) from 2.5 metres depth, including 63 metres at 44% iron oxide, 9% TiO₂ and 0.25% V₂O₅, Saga reported on Monday.
.....................
Vanadium
Modérateurs : Rod, Modérateurs
- energy_isere
- Modérateur

- Messages : 104778
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
- Contact :
Re: Vanadium
un prospect de Vanadium (et Titane) au Labrador.
- energy_isere
- Modérateur

- Messages : 104778
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
- Contact :
Re: Vanadium
la derniére fiche USGS pour le Vanadium https://pubs.usgs.gov/periodicals/mcs20 ... nadium.pdf
Data in metric tons of contained vanadium unless otherwise noted)

mon post de l' an dernier : http://www.oleocene.org/phpBB3/viewtopi ... 2#p2407722
Data in metric tons of contained vanadium unless otherwise noted)

mon post de l' an dernier : http://www.oleocene.org/phpBB3/viewtopi ... 2#p2407722
- energy_isere
- Modérateur

- Messages : 104778
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
- Contact :
Re: Vanadium
suite de ce post du 9 mai 2021 : viewtopic.php?p=2318825#p2318825
https://www.miningweekly.com/article/pr ... 2026-04-15Primary vanadium producer Largo reports higher Q1 output, plans to supply base metals, PGMs
Maracás Menchen mine, in Brazil
15th April 2026 By: Marleny Arnoldi
SX- and Nasdaq-listed vanadium and ilmenite producer Largo has achieved a 101% year-on-year increase in vanadium pentoxide ( V2O5) production to 2 616 t in the first quarter of the year.
This compares to 1 297 t of V2O5 produced in the first quarter of last year.
Total ore mined increased by 90% year-on-year to 852 046 t, while the effective ore grade was also higher at 0.48%, compared with 0.41% in the prior corresponding quarter.
Largo’s first-quarter sales totalled 2 141 t of V2O5-equivalent, which increased by 3.6% year-on-year.
........................
