Pérou

Impact de la déplétion sur la géopolitique présente, passée et à venir.

Modérateurs : Rod, Modérateurs

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 14 juin 2013, 17:38

Le gouvernement du Pérou veut lancer des appels d' offre pour 26 concessions pétroliéres dans la partie Amazonienne, et attirer au moins 1 milliard de $ d' investissements.
Les communautées indigénes devront éte consultées.
Peru Seeks Investments of at Least $1B in Amazon Oil Auction

Rigzone June 13, 2013

LIMA, Peru - Peru's government aims to attract more than $1 billion in investments in an upcoming public auction of 26 oil concessions in the country's Amazon region, a top government official said.

The chairman of government agency Perupetro, Luis Ortigas, said that exploration investments in each concession will be between $40 million and $50 million.

"If it were $50 million, we're talking about $1.3 billion for the exploration phase," Mr. Ortigas said Thursday in an interview.

In late May, Perupetro launched an auction for nine offshore oil concessions, its first international auction in about three years. The government has said more than 20 companies are interested in that auction, which is expected to bring in total investments of at least $450 million during exploration.

Perupetro decided to go ahead with the auction for the offshore concessions and postpone the auction for the blocks in the Amazon because of a new law that requires the government to consult with indigenous communities prior to the development of natural-resource projects.

The law updated Peru's domestic legislation to comply with the International Labor Organization's Convention 169, which requires prior and informed consultation with indigenous communities before developing projects that could affect them.

The government has said the legislation is an important tool to avoid social conflicts over natural-resource projects by improving consultation with rural indigenous communities. A number of mining and energy projects have been delayed in Peru due to opposition from rural communities.

Mr. Ortigas said Perupetro aims to start the consultation for the 26 concessions in July. While the law's regulations say that the consultation process should take 120 days, Mr. Ortigas said it could be longer in this case. "It is the first time we are doing this, so it is possible that it will take a little longer," he said. "We have to learn along the way."

Mr. Ortigas said Perupetro hopes to launch the auction for oil concessions in Peru's Amazon before the end of 2013.
http://www.rigzone.com/news/oil_gas/a/1 ... il_Auction

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 14 mars 2014, 18:59

Le gouvernement du Pérou va lancer un appel d' offre pour 6 concessions pétroliéres offshores
dans les 2 prochains mois.
Peru to Open Bidding on Offshore Oil Blocks in Next 2 Months

Rigzone News March 13, 2014

Peru will open bidding on six offshore oil blocks this month or next after having agreed to exclude state-run energy firm Petroperu from the auction at the request of private bidders, an official said on Wednesday.

Luis Ortigas, the president of the government energy agency Perupetro, said the exploratory offshore oil auction that was suspended indefinitely in December will start "at the end of March or in the beginning of April."
..............
http://www.rigzone.com/news/oil_gas/a/1 ... t_2_Months

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 11 mars 2015, 13:21

Le gouvernement du Pérou va lancer un appel d' offre pour un gros bloc pétrolier, fin des candidature au 13 Avril.
Government: Bids on Peru's Biggest Oil Block to Start in April

by Reuters March 06, 2015

Bidding on the rights to develop Peru's biggest oil block will begin next month, and a winner will likely be announced in August, state energy agency Perupetro said on Thursday. April 13 is the tentative date set for the start of bidding, but the government must first wrap up negotiations with indigenous groups over pollution, Perupetro president Luis Ortigas said, adding that an agreement is expected next week. -
.................
http://www.rigzone.com/news/oil_gas/a/1 ... t_in_April

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 21 avr. 2015, 11:03

Technip: Tipiel remporte un contrat au Pérou.

Cercle Finance | Publié le 21/04/2015

Tipiel, la filiale colombienne de Technip, a remporté auprès de Consorcio Constructor Ductos del Sur un contrat pour un nouveau gazoduc au Pérou.

Le contrat sur une base forfaitaire couvre l'ingénierie d'avant-projet détaillé et l'ingénierie de détail et le développement d'un nouveau gazoduc destiné à transporter du gaz depuis le champ Camisea jusqu'au sud du Pérou.

Lancé par le gouvernement péruvien, le projet comprend une conduite de gaz d'un diamètre de 32 pouces longue de plus de 1700 kilomètres.

Le contrat vise à améliorer le réseau d'énergie péruvien et contribuera au développement d'un pôle énergétique et pétrochimique dans le sud du pays.

L'ensemble des travaux sera réalisé par les bureaux de Tipiel à Bogota, en Colombie.
http://bourse.lefigaro.fr/indices-actio ... ou-4166320

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 09 mars 2016, 08:03

Engie remporte un projet de 40 MW dans le solaire au Pérou

le 4 mars 2016

Engie, par le biais de ses filiales Enersur et Solairedirect, a annoncé le 2 mars 2016 avoir remporté un projet de 40 MW dans le cadre du 4e appel d’offres national lancé au Pérou portant sur une capacité totale de 185 MW.

Ce succès, dans un contexte d’appel au marché très sélectif, traduit la compétitivité du prix proposé par les deux filiales d’Engie qui s’établit à 48,5 $/MWh. Ces niveaux de tarif confirment la baisse constante de l’énergie solaire au Pérou qui atteint un prix plancher record en Amérique du Sud. La mise en service du parc solaire Intipampa, situé dans le sud du Pérou, est programmée pour 2017. Le contrat prévoit une exploitation commerciale d’une durée de 20 ans.

Avec ce nouveau projet, Engie poursuit sa dynamique de développement dans le solaire en Amérique du Sud. Via ses filiales, le groupe possède déjà 2 centrales solaires dans le nord du Chili et une au Panama. Cette nouvelle annonce fait également suite aux 230 MW remportés conjointement par ses filiales Tractebel Energia et Solairedirect en novembre dernier au Brésil.
http://www.constructioncayola.com/envir ... -perou.php

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 03 nov. 2016, 11:21

Le Pérou, futur exportateur d’énergie ?

20 octobre 2016 / Écrit par: La Rédaction Energeek

Surfant sur une croissance économique au beau fixe, le Pérou, troisième plus grand pays d’Amérique du Sud, se transforme peu à peu en champion énergétique. Les nouvelles capacités de production installées ces derniers mois en font un des principaux producteurs d’électricité du continent et pourraient bientôt lui permettre d’exporter son excédent de production.

Les centrales hydrauliques péruviennes, symbole d’un secteur en plein boom



Bénéficiant des retombées positives d’une expansion économique sans pareil depuis le début des années 2000, le secteur de l’énergie péruvien connaît aujourd’hui une forte progression. Cumulés aux centrales thermiques traditionnelles, le développement des énergies renouvelables et l’exploitation croissante de son fort potentiel hydroélectrique placent le pays dans une situation des plus confortables.

« Les centrales hydroélectriques construites depuis 2009, les centrales thermiques qui fonctionnent avec du gaz et les duales (au gaz ou au diesel), plus la chute de la demande d’il y a quelques années, permettent au Pérou d’avoir un surplus d’énergie, avec une réserve assez importante », explique à l’AFP l’ancien ministre de l’Energie, Carlos Herrera. De nouvelles centrales hydroélectriques, dont celle de Chaglla, mise en service fin septembre dans la région de Huanuco, et l’installation de Cerro del Aguila, en cours de construction, permettront en effet à terme de porter la part de l’énergie hydraulique dans la production électrique du Pérou à 40 %. En 2015, l’hydroélectricité représentait 34 %, contre 63 % d’origine thermique, le reste provenant du solaire ou de l’éolien.

Une réserve surtout stratégique pour le gouvernement qui souhaite se prémunir contre toute hausse intempestive de la demande d’énergie. « Je pense que nous ne devons pas cesser d’investir dans (le secteur de) l’énergie (…) Car si nous avons un surplus aujourd’hui, dans deux ou trois ans, on pourrait être en manque », ajoute Carlos Herrera.

Une stratégie de développement favorable à l’exportation

Le gouvernement n’entend donc pas s’arrêter en si bon chemin et prévoit de poursuivre ses investissements quitte à exporter l’énergie produite en surplus. A ce jour, le Pérou dispose d’une puissance installée de 12.189 MW selon les données du gouvernement. Or, le pays ne consomme au maximum que 6.600 MW environ, et la croissance moyenne de la demande estimée à 500 MW par an ne devrait pas causer de difficultés d’approvisionnement dans la décennie à venir.

Néanmoins, « tant qu’il ne sera pas clair qu’il y a suffisamment d’énergie et que celle-ci est garantie pour la consommation interne, il y aura toujours des discussions sur l’opportunité d’en exporter », juge le directeur d’Odebrecht Energie pour l’Amérique latine, Erlon Arfelli. Le pays andin, soucieux de garantir sa sécurité énergétique à long terme pourrait donc sur proposition du nouveau président, le libéral de centre droit Pedro Pablo Kuczynski, multiplier les projets énergétiques.

Le Pérou dispose encore pour cela d’un potentiel de production de 20.000 MW dans la zone andine et de 20.000 MW supplémentaires dans la jungle. Les projets envisagés ici devront toutefois surmonter plusieurs difficultés liées au coûts financiers et environnementaux de ces installations (dans la jungle notamment).
http://lenergeek.com/2016/10/20/le-pero ... -denergie/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 23 nov. 2019, 15:43

Réservation d'un bateau de forage pour forer en Q1 2020 dans le Tumbes basin.
Karoon Energy contracts Stena Forth drillship for Marina-1 off Peru
Melbourne-based Karoon Energy Limited has contracted the dynamic positioning drillship Stena Forth to drill the company’s Marina-1 wildcat in the Tumbes basin offshore Peru.


Rick Wilkinson Nov 18th, 2019

Image


The well, in Karoon’s 40% owned and operated Block Z-38, is scheduled to be spudded early in first quarter 2020. Water depth is 350 m and the well will be drilled to a TD of 3,026 m.

Marina prospect is a large fault-bounded structure with prospective reservoirs at multiple levels from 900-2,900 m subsea. The feature has a prospective resource of 256 million barrels of oil and, if successful, would de-risk a number of other prospects in the block as well as in Karoon’s 100%-owned Area 73 technical evaluation permit to the south.

Karoon said the well is a critical milestone for assessing the prospectivity of the deeper waters off northern Peru. It is the first well to be drilled in Z-38.

The Stena Forth vessel is a recently delivered harsh water drillship with capabilities to drill in far deeper water and much rougher sea states than those found off Peru.

Of Karoon’s JV partners in Z-38, Tullow Oil Ltd. has 35% interest and Pitkin Petroleum 25% (OGJ Online, May 8, 2019).
https://www.ogj.com/drilling-production ... 1-off-peru

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 31 janv. 2020, 00:13

Suite du post au dessus.
Le forage offshore annoncé vient de commencer.
Drilling Underway at Offshore Peru Prospect

by Matthew V. Veazey|Rigzone Staff January 29, 2020

Drilling begins at Marina-1 in Block Z-38 of the Tumbes Basin.
Karoon Energy Ltd. reported Tuesday the Stena Forth drillship has spud the Marina-1 exploration well in Block Z-38 of the Tumbes Basin offshore Peru.

KEI (Peru Z-38) Sucursal del Peru, a wholly owned Karoon subsidiary, operates the well and owns a 40-percent net interest in the license, according to a written statement from Karoon. Tullow Oil Limited and Pitkin Petroleum hold the remaining 35-percent and 25-percent stakes, respectively, the firm added.

The Stena Forth should require an estimated 30 days to drill to approximately 9,843 feet (3,000 meters) subsea at Marina-1, Karoon stated. The firm noted the prospect comprises a large fault-bounded structure with multiple targets from 2,953 to 9,843 feet (900 to 3,000 meters) subsea. It added the gross prospective resources best estimate for Marina is 256 million barrels of oil.

Block Z-38 lies northwest of the Talara Basin, whose oil fields have yielded more than 1.7 trillion barrels over the past 150-plus years, Karoon’s website states.
https://www.rigzone.com/news/drilling_u ... 7-article/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 19 févr. 2020, 00:37

Suite du post au dessus.

Puit sec !
Deepwater Peru Well is a Dry Hole

by Matthew V. Veazey|Rigzone Staff|Tuesday, February 18, 2020

Deepwater Peru Well is a Dry Hole
The Karoon-operated Marina-1 exploration well will be plugged and abandoned.
Tullow Oil plc reported Monday that the Karoon Energy-operated Marina-1 exploration well, drilled on the Z-38 license in the Tumbes Basin offshore Peru, having reached total depth and having encountered no significant hydrocarbons, will be plugged and abandoned.

Karoon, through its KEI (Peru Z-38) Sucursal del Peru subsidiary, holds a 40-percent interest in Marina-1. Tullow and Pitkin Petroleum own the remaining 35-percent and 25-percent interests, respectively. As Rigzone has reported, the partners spud the well late last month with the Stena Forth drillship.

“This is the first ever well in the deepwater section of the under-explored Tumbes Basin,” Mark MacFarlane, chief operating officer of Tullow, noted in a written statement emailed to Rigzone.

Tullow also stated that Marina-1 reached a total depth of 3,022 meters in 362 meters of water. The company added the well tested the La Cruz and Mal Pelo formations.

“We will now integrate the important well information with the seismic data that we are currently reprocessing and update our prospect inventory for blocks Z-38 and Z-64,” continued MacFarlane. “Tullow is building an extensive exploration in Peru and, while this result is not what we had hoped for, we remain positive about Peru’s wider offshore exploration potential.”

In a separate written statement Monday, Karoon noted the well progressed to plan, on time, within budget and with no safety or environmental incidents. It added that its primary focus remains completing its acquisition from Petrobras of the Bauna oil field in the Santos Basin offshore Brazil.
https://www.rigzone.com/news/deepwater_ ... 3-article/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 21 août 2020, 07:22

Low prices put the Brakes On Peru’s Oil Ambitions

By Matthew Smith - Aug 20, 2020
https://oilprice.com/Energy/Crude-Oil/L ... tions.html

Image

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 11 avr. 2021, 22:53

Au Pérou, Anglo American et Engie Energía Perú ont signé des accords pour convertir leurs contrats actuels en un approvisionnement 100% renouvelable.

AVRIL 9, 2021

La société minière Anglo American a annoncé la signature d’accords avec Engie Energía Perú, le siège local de la multinationale française Engie, pour convertir la totalité de l’approvisionnement en électricité de son projet Quellaveco (187 MW) en énergie verte à 100%.

L’accord prévoit la conversion des contrats classiques actuels en fourniture d’électricité renouvelable, et à partir de 2029 et pour une durée de huit ans, un contrat de fourniture d’électricité 100% verte (pour 150 MW).

Anglo American devient ainsi la première société minière à promouvoir la construction d’une centrale d’énergie renouvelable non conventionnelle afin d’utiliser 100% d’énergie renouvelable dans ses opérations. Le projet Quellaveco est actuellement en cours de construction dans la région de Moquegua.

L’électricité prévue par le contrat de fourniture (187 MW) sera 100% verte et s’appuiera sur les sources d’énergie renouvelables d’Engie Energía Perú, notamment sur sa future centrale éolienne Punta Lomitas de 260 MW située à Ocucaje-Ica, ainsi que sur une ligne de transmission de 60 kilomètres qui reliera la centrale au système électrique interconnecté national (SEIN).
https://www.pv-magazine.fr/2021/04/09/e ... -au-chili/

nemo
Hydrogène
Hydrogène
Messages : 7447
Inscription : 11 oct. 2005, 03:46
Localisation : Limoges

Re: Pérou

Message par nemo » 14 avr. 2021, 19:34

élection présidentiellle au Pérou un candidat d'extréme gauche est arrivé en tête au premier tour. Il en en face de lui la fille de Fujimori de sinistre mémoire. A voir comment vont évoluer les choses...
"Tu connaîtras la vérité et la vérité te rendra libre"
Saint Jean 8, 32
"Dans le spectacle la vérité est un moment du mensonge"
Debord
"Aucun compromis sur les principes, toutes les adaptations sur le terrain."
Anonyme

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 20 juil. 2021, 08:02

Pedro Castillo, "le premier président pauvre" du Pérou

AFP•20/07/2021

Pedro Castillo, instituteur rural sorti de l'anonymat il y a quatre ans en menant une grève des enseignants, a été officiellement élu lundi président du Pérou, devenant ainsi le premier chef de l'Etat sans lien avec les élites politiques, économiques et culturelles.

L'élection de ce syndicaliste de 51 ans à la tête du pays andin de 33 millions d'habitants a été confirmée dans la soirée par le Jury national électoral (JNE) après un scrutin très serré face à son adversaire de la droite populiste Keiko Fujimori qui a multiplié les recours, avant d'annoncer qu'elle reconnaîtrait les résultats .
..................
https://www.boursorama.com/actualite-ec ... 0aa699677f
A l'issue du dépouillement de 100% des bulletins de vote, l'ONPE avait donné Pedro Castillo, 51 ans, vainqueur avec 50,12% des voix, contre 49,87% à sa rivale, Keiko Fujimori, 46 ans.

Selon les résultats actualisés par le JNE, M. Castillo l'emporte avec 44.263 voix d'avance sur la fille de l'ex-président Alberto Fujimori (1990-2000).
https://www.boursorama.com/actualite-ec ... 49fbbb8162

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 26 sept. 2021, 23:12

suite de ce post du 12 oct 2010 http://www.oleocene.org/phpBB3/viewtopi ... 73#p280373
Le Premier ministre péruvien menace de nationaliser le champ de gaz de Camisea

AFP parue le 26 sept. 2021

Le Premier ministre péruvien Guido Bellido a menacé dimanche de nationaliser l'immense champ de gaz naturel de Camisea, dans la région de Cusco, si le consortium international chargé de son exploitation n'accepte pas de renégocier la répartition des bénéfices.

"Nous demandons à la société qui exploite et commercialise le gaz de Camisea de renégocier la répartition des bénéfices en faveur de l'État, sinon nous opterons pour la récupération ou la nationalisation de notre champ", a déclaré M. Bellido sur son compte Twitter.

L'exploitation du champ de Camisea, dans le sud-est du Pérou, est entre les mains d'un consortium composé de capitaux américains, sud-coréens, algériens, argentins et espagnols.

"Nous devons avoir du gaz dans le pays qui soit accessible à ceux qui en ont le moins", a déclaré M. Bellido aux journalistes lors d'une réunion avec les organisations syndicales à Arequipa, déplorant également que son pays doive payer sa consommation à des "coûts internationaux".

Selon le gouvernement, plus de 1,2 million de foyers reçoivent actuellement du gaz naturel, soit un sixième des foyers péruviens.

Le Pérou exporte du gaz naturel liquéfié vers le Mexique, la Chine, le Japon, la Corée du Sud et certains pays européens.

Camisea est l'une des plus grandes réserves d'Amérique du Sud.
https://www.connaissancedesenergies.org ... sea-210926

Le champs gazier Camisea est onshore et est crédité d'une réserve initiale de 380 milliards de m3.
Début de production en 2004.
https://en.wikipedia.org/wiki/Camisea_Gas_Project

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89516
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Pérou

Message par energy_isere » 27 déc. 2021, 19:31

EDF Renouvelables remporte un appel d’offres au Pérou associant production et stockage d’électricité solaire
La centrale hybride d’environ 100 MW de capacités photovoltaïques et de plus de 100 MWh de stockage par batteries alimentera le microgrid d’Iquitos avec une électricité faiblement carbonée et à un prix plus compétitif que le diesel, actuellement majoritairement utilisé.

DÉCEMBRE 20, 2021 GWÉNAËLLE DEBOUTTE

L’appel d’offres pour un projet d’énergies renouvelables à Iquitos, au Pérou, a été remporté par EDF Renouvelables, qui assurera le développement, la construction et l’exploitation d’environ 100 MW de capacités photovoltaïques, et de plus de 100 MWh de stockage par batteries. Située à proximité de la forêt amazonienne, Iquitos, plus grande ville au monde non-connectée à un réseau électrique national, utilise actuellement exclusivement du diesel pour sa production d’électricité. EDF Renouvelables y appliquera donc une solution bas carbone adaptée aux zones isolées, comme les îles, et remplacera 40 à 50 % de l’électricité produite à partir d’énergies fossiles, permettant ainsi d’éviter l’émission de 2 millions de tonnes de CO2. La centrale hybride solaire couplée à des batteries, sera connectée à un microgrid d’Iquitos qui fournit aujourd’hui l’électricité aux 550 000 habitants.

Dans ce cadre, EDF Renouvelables a signé un contrat de vente d’électricité d’une durée de 20 ans avec Electro Oriente, une entreprise publique péruvienne de distribution d’électricité. Ce contrat prévoit la fourniture d’électricité faiblement carbonée d’ici 2026, à un prix plus compétitif que le diesel. « Nous sommes fiers de renforcer notre engagement pour la transition énergétique en Amérique du Sud, en fournissant des solutions d’énergie bas carbone au Pérou, a commenté Frederic Belloy, Directeur international d’EDF Renouvelables. Cette solution innovante de microgrid permettra à la ville d’Iquitos de réduire sa part d’énergies fossiles, et de se prémunir contre la volatilité des cours du pétrole.
https://www.pv-magazine.fr/2021/12/20/e ... e-solaire/

Répondre