L'acier, le fer

Discussions traitant de l'impact du pic pétrolier sur l'économie.

Modérateurs : Rod, Modérateurs

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 06 nov. 2022, 13:32

Gros projet en Inde dans l' acier : 7.2 milliards de $ d' investissements
ArcelorMittal-Nippon Steel JV begins $7.2bn India plant expansion
The expansion project aims to increase the Hazira plant’s crude steel capacity from current 9Mtpa to 15Mtpa.


October 31, 2022

The ArcelorMittal Nippon Steel India (AM/NS India) joint venture (JV) between steelmakers ArcelorMittal and Nippon Steel, has started the Rs600bn ($7.2bn) Hazira flat steel plant expansion project in Gujarat, India.

The expansion project aims to increase the crude steel capacity from the current nine million tonnes per annum (Mtpa) to 15Mtpa.

Expected to create 60,000 jobs, the project will involve upstream and downstream steelmaking expansion.

The project is also expected to help the country to reduce steel imports, which are used in various sectors such as defence, infrastructure and automotive.

Over the next decade, AM/NS India aims to lead the decarbonisation of the steel industry through initiatives such as exploring the use of low-carbon technologies and integrating renewables into its energy supply chain.

India Prime Minister Narendra Modi said: “This project will create job opportunities in Gujarat and across India, apart from inspiring the manufacturing of high-grade steel while playing a critical role in reducing import dependence in critical and strategic applications.

“The company’s latest technology for this project will prove to be a milestone and provide a fillip to the Make in India and Atmanirbhar Bharat initiatives.”

ArcelorMittal Nippon Steel India CEO Dilip Oommen said that the plant’s expansion will enable the production of high-grade value-added steel solutions while complying with the government’s import substitution policy goals.

The company aims to increase its national crude steel capacity to 30Mtpa in the coming decade, which would contribute to India’s National Steel Policy, which targets 300Mtpa domestic capacity by 2030.

Indian Union Steel Minister Jyotiraditya Scindia said: “India’s path to achieving 300 million tonnes of steelmaking capacity will require significant capital, advanced manufacturing technologies and deeper experience in the execution of large-scale projects. I am certain that this collaboration will help bring all three into the fold.”
https://www.mining-technology.com/news/ ... expansion/

D'aprés les chiffre de 2019 sur Wikipedia l' Inde est le n°2 mondial avec 111 millions de tonnes d'acier.
https://fr.wikipedia.org/wiki/Liste_de_ ... _d%27acier

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 20 nov. 2022, 11:22

suite de ce post du 5 juin 2022 viewtopic.php?p=2344722#p2344722

Pas d'extension de la mine de fer Baffinland Iron Mine au Nord du Canada pour des raisons environnementales :
Minister denies Baffinland Iron Mines expansion in Nunavut

Staff Writer | November 17, 2022

Baffinland Iron Mines corporation announced Thursday that the Minister of Northern Affairs Dan Vandal denied the company’s Phase 2 expansion application.


In May, Baffinland Iron Mines’ proposed expansion of its Mary River iron ore operation on the northern tip of Baffin Island, in Canada’s Nunavut territory, suffered a major blow after a review board advised against the project on environmental grounds.

After four years of consultations and deliberations, the Nunavut Impact Review Board (NIRB) rejected the miner’s request to more than double output to 12 million tonnes a year, to eventually reach 30 million tonnes annually.

Mary River, considered one of the world’s richest iron deposits, opened in 2015 and ships about six million tonnes of ore a year.

“We are disappointed by the Minister’s decision,” Baffinland CEO Brian Penney said in Thursday’s news release. “Our Phase 2 proposal was based on on years of in-depth study and detailed scientific analysis, we executed a new Inuit Certainty Agreement with the QIA, and we have had extensive consultations with, and made additional commitments to stakeholders post release of the NIRB recommendation in May.”

“The Minister’s decision has immediate and significant implications for the current MAry River operations and our workforce of 2,500 people,” Penney said. “We look forward to immediately meeting with the QIA and the Minister to discuss a practical path forward.”

If the expansion is approved, Baffinland would send about 12 million tonnes of the 30 million tonnes via the North Railway to Milne Port. It also plans to build a second railway to Steensby Port, from which it intends to ship an additional 18 million tonnes of ore a year.

Current shipping volumes have already had a “devastating” impact on the area’s narwhal population, Inuit hunters have said.

Last year, a group of hunters from Arctic Bay and Pond Inlet blocked access to the mine in protest of the company’s ice breaking practices due to their negative impacts on narwhals.
https://www.mining.com/minister-denies- ... n-nunavut/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 18 déc. 2022, 14:03

Le prix du minerai de fer se redresse en Chine.
Iron ore price hits six-month high as China plans more stimulus

MINING.COM Staff Writer | December 15, 2022

The iron ore price hit a fresh six-month high on Thursday, propelled by brightening demand prospects in China.


As the Chinese economy faces risks from rapidly spreading covid-19 infections and a bleak outlook for global growth, policymakers are aiming to boost the scale of consumption and investment, the official Xinhua news agency said on Wednesday.

Boosting domestic demand will help China to pursue higher-quality economic growth and cope with external risks, Xinhua said, citing the 2022-2035 plans issued by the cabinet.

According to Fastmarkets MB, benchmark 62% Fe fines imported into Northern China were changing hands for $112.71 a tonne Thursday morning, up 2.5%.

Image

The most-traded May iron ore on China’s Dalian Commodity Exchange ended daytime trade 3.2% higher at 830 yuan ($119.05) a tonne. It earlier touched 832 yuan, the highest since June 15.

“The accelerated implementation of plans to stabilize the economy (and) the optimization of epidemic prevention policies… have boosted market sentiment,” Zhongzhou Futures analysts said in a note.

China’s November steel output, meanwhile, fell 6.5% from the previous month, as some steelmakers cut production to curb losses amid persistently weak demand.
https://www.mining.com/iron-ore-price-h ... -stimulus/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 02 janv. 2023, 19:33

Pour se décarboner, Arcelor Mittal se consolide dans la feraille :
ArcelorMittal acquiert l'entreprise polonaise de recyclage de ferraille Zlomex

AOF•29/12/2022

ArcelorMittal annonce aujourd'hui avoir signé un accord pour acquérir l'entreprise polonaise de recyclage de ferraille Złomex. La clôture de la transaction, qui est soumise aux approbations réglementaires habituelles, est attendue au cours du premier semestre 2023. Zlomex exploite des parcs à ferraille à Cracovie et à Varsovie qui ont traité et expédié l'année dernière près de 400 000 tonnes de ferraille. Zlomex fournit une gamme d'aciéries et de fonderies et est également un fournisseur de longue date des aciéries d'ArcelorMittal à Dąbrowa Górnicza et Varsovie.

Zlomex se concentre sur la ferraille ferreuse et a étendu en 2022 ses opérations à Cracovie avec l'installation d'un nouveau broyeur et d'un nouvel équipement de séparation et a investi dans l'agrandissement de son chantier de Varsovie. ArcelorMittal s'engage à soutenir la stratégie de croissance continue de Zlomex.

Il s'agit de la quatrième acquisition de ferraille qu'ArcelorMittal a entreprise en Europe en 2022, alors que la société cherche continuellement à améliorer sa capacité à s'approvisionner en ferraille, une matière première clé qui soutient la capacité du groupe à réduire ses émissions de carbone.
https://www.louvrelens.fr/exhibition/hi ... ion#onglet

al2o3
Goudron
Goudron
Messages : 176
Inscription : 11 juil. 2017, 12:21

Re: L'acier, le fer

Message par al2o3 » 02 janv. 2023, 22:59

energy_isere a écrit :
02 janv. 2023, 19:33
Pour se décarboner, Arcelor Mittal se consolide dans la feraille :
ArcelorMittal acquiert l'entreprise polonaise de recyclage de ferraille Zlomex

AOF•29/12/2022

ArcelorMittal annonce aujourd'hui avoir signé un accord pour acquérir l'entreprise polonaise de recyclage de ferraille Złomex. La clôture de la transaction, qui est soumise aux approbations réglementaires habituelles, est attendue au cours du premier semestre 2023. Zlomex exploite des parcs à ferraille à Cracovie et à Varsovie qui ont traité et expédié l'année dernière près de 400 000 tonnes de ferraille. Zlomex fournit une gamme d'aciéries et de fonderies et est également un fournisseur de longue date des aciéries d'ArcelorMittal à Dąbrowa Górnicza et Varsovie.

Zlomex se concentre sur la ferraille ferreuse et a étendu en 2022 ses opérations à Cracovie avec l'installation d'un nouveau broyeur et d'un nouvel équipement de séparation et a investi dans l'agrandissement de son chantier de Varsovie. ArcelorMittal s'engage à soutenir la stratégie de croissance continue de Zlomex.

Il s'agit de la quatrième acquisition de ferraille qu'ArcelorMittal a entreprise en Europe en 2022, alors que la société cherche continuellement à améliorer sa capacité à s'approvisionner en ferraille, une matière première clé qui soutient la capacité du groupe à réduire ses émissions de carbone.
https://www.louvrelens.fr/exhibition/hi ... ion#onglet
Cela est bon pour arcelor mais pour la planète c est un jeu à somme nul. Ce que am récoltera en ferrailles, c est ce qu un concurrent aura en moins. L Interet est d avoir un avantage en taxe carbone vs les autres s ils n arrivent pas à se fournir en recyclés.
ce que l on appel acier zéro carbone concerne le recyclage, d ou l Interet de l acquisition.

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 03 janv. 2023, 08:34

Ca a quand meme le mérite de favoriser encore plus le recyclage des ferrailles et d'en valoriser le maximum.

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 08 janv. 2023, 11:22

suite de ce post du 30 juillet 2022 viewtopic.php?p=2348227#p2348227
Rio Tinto, Baowu take next step towards developing Guinea joint venture

Reuters | January 4, 2023

Rio Tinto’s Guinea unit has agreed terms with joint venture partners including China’s Baowu on developing infrastructure for the huge Simandou iron ore mine, the next step towards building a project in which it has held a stake since 1997.


Simandou lies in a remote corner of Guinea and the challenge of transporting high-grade iron ore from the mine to market has long hindered its development. Guinea’s government requires any developer to build a 600-km railway to the coast.

Rio’s Guinea unit formed a joint venture last July with Winning Consortium Simandou (WCS) and the Guinean government to develop that rail and port infrastructure.

A Rio spokesperson said they and Baowu Resources Co Ltd have now signed a non-binding term sheet as the next step towards achieving the shareholder agreement, cost estimates and regulatory approvals needed to push ahead with that.
.......................
https://www.mining.com/web/rio-tinto-ba ... t-venture/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 08 janv. 2023, 21:29

suite de ce post du 8 octobre 2021 viewtopic.php?p=2328213#p2328213

Début d'exploitation du minerai de fer de Gara Djebilet en Algérie :
.............
Le Conseil des ministres tenu en mai 2022 sous la présidence du président de la République, M. Abdelmadjid Tebboune, avait approuvé le lancement de la 1ère phase de l'exploitation du projet de minerai de Gara Djebilet, avant que le lancement officiel ne soit donné au mois de juillet passé.

Au mois d'août passé, le Directeur général adjoint de l'Entreprise national de fer et de l'acier (FERAAL), Redha Belhadj avait annoncé, dans une déclaration à l'APS, l'extraction d'une première quantité de minerai de fer, estimée à 1000 tonnes, deux mois après l'entrée en exploitation.

Selon les estimations de l'entreprise FERAAL, dans la phase d'exploitation (2022-2025), la capacité de production du minerai variera entre 2 et 3 millions de tonnes de minerai de fer, pour arriver à 40-50 millions tonnes/an à partir de 2026.
https://www.aps.dz/economie/149790-side ... a-l-avenir

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 15 janv. 2023, 14:00

suite de ce post du 18 sept 2022 viewtopic.php?p=2352829#p2352829
Civmec gets over $228m contract for Rio’s Western Range project

Reuters | January 9, 2023

Singapore-listed Civmec Ltd has received a contract worth more than A$330 million ($228.56 million) for Rio Tinto’s Western Range project in Pilbara, Western Australia, the construction service provider said on Monday.


Civmec will carry out engineering work from its Henderson facility in Western Australia for the miner, while off-site work for the project will commence immediately, the company said in a statement.

At the peak of operations it will employ over 400 people on site, Civmec said.

“This (contract) allows us to start the new year with an order book in excess of A$1.150 billion,” said Patrick Tallon, Civmec’s chief executive officer.

Rio Tinto’s Western Range project, which is being built in partnership with state-owned China Baowu Steel Group Co, is currently scheduled for completion in the first half of fiscal 2025.

In September, Rio said it would invest $1.3 billion to develop the iron ore project and hold a 54% stake.

($1 = 1.4438 Australian dollars)
https://www.mining.com/web/civmec-gets- ... e-project/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 28 janv. 2023, 15:37

suite de ce post du 3 sept 2022 viewtopic.php?p=2351354#p2351354
Gabon : l’exploration du gisement de fer de Baniaka à 20% de réalisation

Agence Ecofin 22 janvier 2023

On ignore toujours en revanche la date de début d’exploitation de ce gisement dont l’entrée en production est prévue pour mi-2024. Le Gabon compte principalement sur ce projet et sur celui du gisement de fer de Belinga pour diversifier son offre minière actuellement dominée par le manganèse.

Le ministre gabonais des Mines, Elvis Ossindji, a apprécié le 17 janvier l’avancement des explorations sur le site du gisement de fer de Baniaka au sud-est du pays, qui « à juste 20% de réalisation, présente des résultats satisfaisants ».

Cette réserve de minerai de fer est estimée à 760 millions de tonnes, mais le potentiel global des ressources devrait dépasser le milliard de tonnes selon les prévisions du gouvernement. La compagnie minière australienne Genmin Ltd, propriétaire du gisement, table sur une exploitation initiale de 5 millions t par an sur 10 ans, passant à 10 millions t au cours de la phase 2.

L’investissement initial sera de 200 millions USD, pour un revenu minimum de 602 millions USD pour l’État, sous forme de redevances minières et d’impôt sur les sociétés. S’agissant des emplois, le gisement de Baniaka « va générer d’ici 2024 700 emplois supplémentaires. Le début de la construction des infrastructures cette année va générer de nombreux emplois au bénéfice des populations locales », a affirmé le ministre.
https://www.agenceecofin.com/mines/2201 ... ealisation

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 29 janv. 2023, 10:52

suite de ce post du 6 juin 2021 viewtopic.php?p=2320521#p2320521

Début de production de minerai de fer du projet Iron Bridge (Australie) au mois de mars.
Fortescue’s Iron Bridge project on track to begin production in March quarter
The magnetite mine is expected to deliver 22 million tonnes per annum of high grade 67% Fe magnetite concentrate


By NS Energy Staff Writer 27 Jan 2023

Fortescue Metals Group announced that the first production at its Iron Bridge magnetite project in the Pilbara region of Western Australia as expected will commence by the end of the March 2023 quarter.

The magnetite mine will yield 22 million tonnes per annum of high grade 67% Fe magnetite concentrate, said the Australia-based iron ore company.

Located 145km south of Port Hedland, the Iron Bridge project has seen the start of energisation and commissioning activities in the wet plant during the quarter that ended on 31 December 2022.

The project has also witnessed continued commissioning of dry processing line A equipment.

Besides, the structural steel installation at the concentrate handling facility at Port Hedland was completed by Fortescue Metals during the reported quarter.

The Iron Bridge project is an unincorporated joint venture (JV) between FMG Magnetite (69%) and Formosa Steel IB (31%). FMG Magnetite is a subsidiary of FMG Iron Bridge, which is owned by Fortescue Metals (88%) and Baosteel Resources International (12%).

The first ore from the Iron Bridge magnetite project was fed into the processing plant in late October 2022.

According to Fortescue Metal, the capital estimate of the magnetite project is $3.6bn-$3.8bn. The company’s investment share in the project will be $2.7bn-$2.9bn.

The company said that it shipped 49.4 million tonnes of iron ore in Q2 FY23, which contributed to 96.9 million tonnes of shipment in H1 FY23.

Fortescue Metals Group executive chairman Andrew Forrest said: “We are now nearing the 200 million tonne annualised rate in our iron ore business even before we commission Iron Bridge.

“Our Company has never performed better on the mining, exploration, green hydrogen and green energy development front, while leading the world as the first heavy industry company to achieve real zero with a fully costed plan.

“Fortescue will step beyond fossil fuels this decade, saving shareholders approximately US$1 billion a year and setting the global stage for all environmentally responsible companies to follow.”
https://www.nsenergybusiness.com/news/f ... h-quarter/

Image
Ore processing facility at Iron Bridge. (Image courtesy of Fortescue Metals Group).

https://www.mining.com/web/fortescues-i ... ents-rise/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 04 févr. 2023, 12:16

suite de ce post du 8 janvier 2023 viewtopic.php?p=2360584#p2360584
Guinée : le développement du projet de fer Simandou reprendra en mars 2023 (gouvernement)

Agence Ecofin 2 fev 2023

En juillet 2022, le gouvernement a ordonné la suspension des activités de Rio Tinto et Winning Consortium Simandou en Guinée, face à la lenteur observée alors dans la mise en œuvre des dispositions de l’accord-cadre relatif au développement du grand gisement de minerai de fer Simandou.

En Guinée, le gouvernement de Transition a annoncé cette semaine la reprise, en mars prochain, des travaux liés à l’exploitation du minerai de fer de Simandou. Suspendu depuis juillet 2022, le développement du projet reprend après une visite de travail effectuée du 11 au 22 janvier 2023 à Pékin en Chine, par une délégation guinéenne composée de membres du gouvernement et d’autres autorités impliquées dans le projet.

Selon les détails fournis par la cellule de communication de la présidence, plusieurs rencontres ont eu lieu avec les autorités chinoises, les deux compagnies minières actives sur le projet (Rio Tinto et Winning Consortium Simandou) et les représentants d’institutions publiques et financières, capables d’apporter les fonds nécessaires à la construction des différentes infrastructures liées à Simandou.

Notons que le plus grand sidérurgiste du monde China Baowu qui envisage d’entrer au capital de WCS afin de sécuriser un approvisionnement futur en minerai de fer, a également participé aux échanges. « L’entrée de Baowu dans le projet est un signal positif de l’importance de Simandou et de l’attrait à long terme de son minerai de fer à haute teneur et à faible degré d’impureté », soulignait début janvier Gerard Rheinberger, un responsable de Rio Tinto cité par Reuters.

Selon un accord-cadre signé en mars 2022, les compagnies actives sur le projet devraient mutualiser leurs investissements pour la construction des infrastructures liées au transport et à l’exportation du fer de Simandou qui se trouve dans une zone à désenclaver. L’entrée en production du projet est attendue en 2025.
https://www.agenceecofin.com/fer/0202-1 ... uvernement

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 11 févr. 2023, 11:14

suite de ce post du 28 janvier 2023 viewtopic.php?p=2361614#p2361614
Gabon : Fortescue prévoit investir 200 millions $ d’ici 2024 pour le fer de Belinga

Agence Ecofin 08 février 2023

Deuxième producteur mondial de manganèse, le Gabon cherche à diversifier son secteur minier en exploitant les autres ressources de son sous-sol, notamment le minerai de fer. Deux groupes australiens accompagnent déjà l’Etat dans cette démarche, Genmin à Baniaka et Fortescue à Belinga.

L’australien Fortescue Metals Group investira 200 millions $ pour le développement du projet de fer Belinga sur la période 2023-2024. C’est ce qu’a déclaré la compagnie minière à l’issue de la cérémonie de signature de la convention minière et du pacte d’associés relatifs à ce projet mardi 7 février à Libreville, la capitale du Gabon.

Selon les détails obtenus par l’Agence Ecofin, ce document donne à Fortescue et à son partenaire émirati, Africa Transformation and Industrialization Fund basé à Abu Dhabi, un intérêt de 90 % dans Ivindo Iron, la société gabonaise qui détient le projet Belinga. Conformément au code minier, l’État gabonais conservera une participation gratuite de 10 % dans ladite société.

Fortescue table sur une production annuelle allant jusqu’à 2 millions de tonnes, même si le potentiel du gisement permet de viser plus haut. L’exploitation devrait commencer au second semestre 2023 avec des mines à ciel ouvert et la production sera transportée par camion et rail jusqu’au port minéralier d’Owendo pour expédition. 800 emplois directs seront générés au troisième trimestre 2023, grâce à ce projet.

Pour rappel, l’État gabonais fonde de grands espoirs sur l’exploitation du minerai de fer, non seulement à Belinga, mais aussi à Baniaka, afin de diversifier un secteur minier actuellement dominé par le manganèse.
https://www.agenceecofin.com/fer/0802-1 ... de-belinga

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 11 févr. 2023, 11:51

suite de 2 posts au dessus.
Guinée : le français Egis nommé ingénieur-conseil pour le projet de fer Simandou

Agence Ecofin 9 fev 2023

Les travaux liés au développement du projet Simandou devraient reprendre le mois prochain, avec les sociétés Rio Tinto et Winning Consortium Simandou. Pour assurer un meilleur suivi de leurs travaux, le gouvernement a décidé d’engager un conseiller technique.

En Guinée, le gouvernement a choisi de se faire accompagner par le groupe français de conseil et d’ingénierie de la construction Egis pour le projet d’exploitation du minerai de fer de Simandou. L’accord qui lie les deux parties a été signé mercredi 8 février à Conakry.

Selon les détails relayés par Engineering News, le contrat de prestation de services accordé à Egis et à son partenaire français Setec s’étend sur 26 mois. Egis agira en tant que conseiller technique pour les infrastructures ferroviaires et portuaires du projet Simandou, en l’occurrence la construction de la ligne ferroviaire (le Transguinéen) reliant Simandou au futur port en eau profonde dans la préfecture de Forécariah.

« Nous aurons à cœur d’assurer le bon équilibre entre le développement socio-économique majeur du pays engendré par un tel projet, et les exigences techniques, environnementales et de bonnes gouvernances les plus strictes », a assuré Arnaud de Rugy, directeur régional Afrique d’Egis.

Pour rappel, les travaux liés au développement de ce gigantesque projet qu’est Simandou devraient reprendre le mois prochain, après une suspension de plusieurs mois décidée par Conakry. Les compagnies minières qui se partagent les quatre blocs du gisement, Rio Tinto et Winning Consortium Simandou, se sont engagées à accélérer les travaux pour une entrée en production d’ici 2025.
https://www.agenceecofin.com/fer/0902-1 ... r-simandou

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89880
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: L'acier, le fer

Message par energy_isere » 22 févr. 2023, 21:35

Fos-sur-Mer: ArcelorMittal va redémarrer un haut-fourneau à l'arrêt

AFP le 22 févr. 2023

Le deuxième sidérurgiste mondial ArcelorMittal va remettre en marche un des deux hauts-fourneaux de son site de Fos-sur-Mer (Bouches-du-Rhône), arrêté fin 2022 en raison de la baisse de la demande d'acier et de l'impact des prix de l'énergie, a annoncé mercredi le directeur du site.

"Nos clients avaient été très impactés" par la crise, mais "on commence à y voir un peu plus clair, nous allons pouvoir redémarrer notre deuxième haut-fourneau," a déclaré Bruno Ribo, directeur d'ArcelorMittal Méditerranée, à l'occasion d'une visite de presse. Ce redémarrage est prévu pour "début avril", a-t-il précisé.

Le groupe sidérurgique avait annoncé début novembre la mise à l'arrêt temporaire d'un des deux hauts-fourneaux du site de Fos, son deuxième plus grand site en France, qui emploie quelque 2.500 salariés ainsi que 1.500 personnes engagées par des sous-traitants, pour une capacité de production de quatre millions de tonnes d'acier par an.

Cette fermeture s'accompagnait de "mesures d'activité partielle (...) à compter de début décembre 2022 pour adapter le temps de travail d'une partie du personnel, à hauteur d'un jour par semaine maximum", avait alors indiqué le groupe, tout en insistant sur son intention de redémarrer le haut-fourneau "dès que les conditions de marché le permettr(aie)nt".
https://www.connaissancedesenergies.org ... ret-230222

Répondre